We installed a basement with pendent sprinklers where the deflector is 1” below the bottom of the wood joist that is 10 inches deep, and the AHJ says that pendent sprinkler heads are not acceptable because heat goes into the bay and delays sprinkler activation.
If the sprinkler is installed 1” below the timber joist, can we consider it as unobstructed construction? If the deflector is installed 11 inches below the roof ceiling and NFPA 13 2019 edition establishes that the distance between the deflector and the ceiling is between 1 and 12 inches for upright and pendent sprinklers, why can we not use pendent sprinklers? Sent in anonymously for discussion. Click Title to View | Submit Your Question | Subscribe
10 Comments
danefre
8/17/2026 08:14:41 am
Based on what you described, this is a compliant arrangement.
Reply
Pete H
8/17/2026 08:19:26 am
You're within 12" of the deck, you're code compliant based on your description.
Reply
jason yeagy
8/17/2026 08:20:54 am
where you install the deflector from the deck would not change the construction type...
Reply
Cassandra
8/17/2026 08:26:08 am
Please see NFPA 13 (2019 or later) 10.2.6.1.2 - As long as you are not more than 22 in. below the roof deck and within 1 in. to 6 in. below the structural members, you are considered within code.
Reply
chad
8/17/2026 10:28:14 am
" the AHJ says that pendent sprinkler heads are not acceptable because heat goes into the bay and delays sprinkler activation."
Reply
Dave
8/17/2026 01:57:19 pm
I use my most respectful "Dale Carnegie" approach, and offer understanding, but respectfully offer to walk the AHJ through the construction type definitions, and deflector distance rules, and why NFPA 13 does not direct you to put sprinklers in each beam pocket. And when it would require than and why this isn't one of those cases. If you have time, seek an informal interpretation from the AFSA of NFSA if you are a member of such a group.
Reply
Steven Dube
8/17/2026 10:35:52 am
Nice job Chad!! Eloquently stated I may add.
Reply
Arthur Gould
8/17/2026 11:35:25 am
A 2"x10" board really isn't a 2"x10". The actual size of a nominal 2x10 piece of lumber is 1-1/2 inches by 9-1/4 inches. You can actually up to 1 3/4" below the bottom of the 2x10.
Reply
Steve Gaillard
8/17/2026 12:59:43 pm
What kind of sprinkler? Are the listed to be used this way? If its say a residential pendent its not listed that way. Need the more information. There are other factors that could effect how this could be interpreted. SSP typically within 12" of deck regardless of the spacing of the joists. Even unobstructed construction allows this. If its obstructed construction 1-6 below the obstruction up to 22.. there is nothing that states it has to be an upright. Remember AHJ's cant just make stuff up on there own. Its not always good to fight them but at the same time dont let them roll you.
Reply
Jack G
8/19/2026 03:55:45 pm
It really depends on the spacing of the joists and the volume of the panels.
Reply
Leave a Reply. |
ALL-ACCESSSUBSCRIBESubscribe and learn something new each day:
COMMUNITYTop July '26 Contributors
YOUR POSTPE EXAMGet 100 Days of Free Sample Questions right to you!
FILTERS
All
ARCHIVES
September 2026
PE PREP SERIES |
RSS Feed