Omit Sprinklers in Partial-Insulated Attic Space?

1/21/2026

8 Comments

 
We are the Engineer of Record (EOR) with an RFI for building in the substantial completion phase of construction.

The contract documents called for delegated fire protection design. The working drawings called for upright sprinklers in the combustible concealed space above a vaulted ceiling.

Instead of installing the uprights, it was agreed by the fire protection sub and general contractor that the space would be filled with insulation.
The FP contractor's engineer, who prepared the working drawings, observed that the concealed space was not completely filled per NFPA 13 requirements. The architect has deemed that fire sprinklers are not required for this building due to the square footage. The rest of the entire building is fully covered.

Can the combustible concealed space between the vaulted ceiling and the roof be considered a portion of the building that is not intended to be covered by sprinklers?

Meaning per New York State (NYS) Fire Code (FC) 901.4.2, the building is partially furnished for protection?

Or, is the combustible concealed space considered part of the open room assembly, meaning it must meet NFPA 13 requirements since the vaulted ceiling for the room space is protected by pendent sprinklers?

Our initial reaction is that if sprinklers are provided and not required by the NYS Building Code, then the system would be considered required per NYS FC 901.4.1 and would need to meet the requirements of NFPA-13.

​What are your thoughts?


Sent in anonymously for discussion. Click Title to View | Submit Your Question | Subscribe
Picture
Observation of insufficient insulation in concealed space.
Picture
8 Comments
Chad
1/21/2026 07:43:12 am

Read Section 9.2 Allowable Sprinkler Omission Locations. from 2019 NFPA 13

This is one example of your situation but you have too much air space? There are other section on insulation


9.2.1.18*
Concealed spaces formed by noncombustible or limited-combustible ceilings suspended from the bottom of wood joists and composite wood joists with a maximum nominal chord width of 2 in. (50 mm), where joist spaces are full of noncombustible batt insulation with a maximum 2 in. (50 mm) air space between the decking material and the top of the batt insulation shall not require sprinklers..


Reply
Glenn Berger
1/21/2026 08:18:51 am

I am not familiar with the NYS Building Code.

But in general - If sprinklers are provided then it must meet the applicable requirements of NFPA 13.

Incomplete sprinkler installations are considered not sprinklered and needs to be remedy. (False sense of protection!)

It appears that there are many options available to fix the situation.

Reply
Jesse
1/21/2026 08:23:04 am

I'm with Glenn in that I'm not familiar with the NYS code very well. But using 13 as my benchmark, I'd submit that this needs to be protected. I don't bdelieve that the insulation installation meets the intent of allowable ommission.

Reply
Anthony
1/21/2026 08:25:16 am

I do a significant amount of work in NYS. If utilizing the exceptions in NFAP-13 for a fully insulated combustible concealed space the space must be fully filled with insulation. There are no allowances for partial systems without AHJ approval and a variance.

NFPA13-16:

8.15.1.2.7 Concealed spaces filled with noncombustible insulation shall not require sprinkler protection.

8.15.1.2.7.1 A maximum 2 in. (50 mm) air gap at the top of the space shall be permitted.

Reply
Pete H
1/21/2026 08:32:31 am

You might be able to get a deal with the AHJ through the defense that chances are the architect has a point about square footage/occupancy and any protection of this building is optional. So you'd be providing a sprinkler system that is not equivalent to NFPA 13 because you're under no obligation from IBC to provide an NFPA 13 system.

But I see no specific code omission that gets you out of this without reclassifying the building as 13R or 13D. You got more than 2" uninsulated.

Reply
Joe M
1/21/2026 08:33:32 am

In these cases, sometimes we need to ask ourselves what our mentor say, and/or what our peers would say in court if something went wrong.

Reply
Dwight H Havens
1/21/2026 09:44:07 am

First, I see wood trusses, not joists. Second, if allowed by the AHJ for the truss system, there is no reason that a thicker insulation batt couldn't have been used. Note: Big difference in the ability of fire to spread through the open space created above the batts in a trussed space, compared to the closed space between joists.

Reply
Ryan J
1/25/2026 10:35:58 am

Im going to assume the air gap they left was for roof venting purposes.

Basically, they would have to add more insulation to the bottom edge of the truss top chord. (Yes, that would still be approx. 4 inches but at that point it's nitpicking)

Reply



Leave a Reply.

    SUBMIT A QUESTION
    Picture
    Why Sponsor?

    ALL-ACCESS

    Picture
    GET ALL OUR TOOLS

    SUBSCRIBE

    Subscribe and learn something new each day:
    I'm Interested In:

    COMMUNITY

    Top July '26 Contributors
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    SEE LEADERBOARD

    YOUR POST

    SUBMIT A QUESTION

    PE EXAM

    Get 100 Days of Free Sample Questions right to you!
    SIGN ME UP!

    FILTERS

    All
    A1171
    ABA
    ADA
    ASCE 7
    ASME A17.1
    ASTM E1354
    Blog Thread
    Daily Discussion
    Design-documents
    EN 12259-1
    EN 12845
    Explosion Protection
    Explosion-protection-prevention
    Fire Detection And Alarm Systems
    Fire Dynamics
    Flammable And Combustible Liquids
    Flammable-combustible-liquids
    FM Global
    Human-behavior
    IBC
    ICC 500
    IEBC
    IFC
    IMC
    IPC
    IRC
    ISO
    Means Of Egress
    NBC
    NFPA 1
    NFPA 10
    NFPA 101
    NFPA 11
    NFPA 110
    NFPA 1142
    NFPA 1221
    NFPA 13
    NFPA 13D
    NFPA 13R
    NFPA 14
    NFPA 15
    NFPA 16
    NFPA 17A
    NFPA 20
    NFPA 2001
    NFPA 214
    NFPA 22
    NFPA 220
    NFPA 24
    NFPA 241
    NFPA 25
    NFPA 291
    NFPA 30
    NFPA 307
    NFPA 30B
    NFPA 31
    NFPA 33
    NFPA 37
    NFPA 400
    NFPA 409
    Nfpa-415
    Nfpa-45
    Nfpa-495
    NFPA 497
    NFPA 5000
    NFPA 502
    NFPA 54
    NFPA 55
    NFPA 654
    NFPA 68
    NFPA 70
    NFPA 701
    NFPA 72
    NFPA 75
    NFPA 770
    NFPA 82
    NFPA 850
    NFPA 855
    NFPA 90A
    NFPA 92
    NFPA 96
    NICET
    OBC
    OSHA
    Passive Building Systems
    PE Prep Guide
    PE Prep Series
    PE Sample Problems
    Poll
    Smoke Management
    Special Hazard Systems
    UFC 3-600-01
    UFC 3-601-02
    UFC 4-021-01
    UFC 4-211-01
    UPC
    Updates
    Water Based Fire Suppression
    Weekly Exams


    ARCHIVES

    August 2026
    July 2026
    June 2026
    May 2026
    April 2026
    March 2026
    February 2026
    January 2026
    December 2025
    November 2025
    October 2025
    September 2025
    August 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    November 2016
    October 2016
    July 2016
    June 2016


    PE PREP SERIES

    SEE LEADERBOARD

    SEARCH THE FORUM

    RSS Feed

Picture
​Home
Our Cause
The Blog
The Forum
PE Exam Prep
The Toolkit

MeyerFire University
​Pricing
Login
​Support
Contact Us
Picture

MeyerFire.com is a startup community built to help fire protection professionals shine.
Our goal is to improve fire protection practices worldwide. We promote the industry by creating helpful tools and resources, and by bringing together industry professionals to share their expertise.

​MeyerFire, LLC is a NICET Recognized Training Provider and International Code Council Preferred Education Provider.

All text, images, and media ​Copyright © 2016-2025 MeyerFire, LLC

We respect your privacy and personal data. See our Privacy Policy and Terms of Service. 
The views, opinions, and information found on this site represent solely the author and do not represent the opinions of any other party, nor does the presented material assume responsibility for its use. Fire protection and life safety systems constitute a critical component for public health and safety and you should consult with a licensed professional for proper design and code adherence.

Discussions are solely for the purpose of peer review and the exchange of ideas. All comments are reviewed. Comments which do not contribute, are not relevant, are spam, or are disrespectful in nature may be removed. Information presented and opinions expressed should not be relied upon as a replacement for consulting services. Some (not all) outbound links on this website, such as Amazon links, are affiliate-based where we receive a small commission for orders placed elsewhere.

  • Blog
  • Forum
  • TOOLKIT
    • ALL TOOLS
    • BUY THE TOOLKIT
  • UNIVERSITY
    • ALL COURSES
    • JOIN THE UNIVERSITY
  • PE Exam
    • PE Forum & Errata
    • PE Store
    • PE Tools
    • PE PREP SERIES
    • PE Old Questions
  • STUDENTS
    • LAND JOB/INTERNSHIPS
    • STUDENT CONNECTOR
  • LOGIN
    • TOOLKIT-ONLY LOGIN
    • UNIVERSITY LOGIN
  • STORE
  • OUR CAUSE
    • ABOUT MEYERFIRE
    • JOB OPENINGS
    • BECOME AN INSTRUCTOR
    • HELP/SUPPORT