I’m working on a super high-rise scheme, five towers over a common 9-story podium. Towers are more than 12 m apart; no connection above podium level; transfer slab is 3-hour rated and sprinklered throughout.
Client is proposing 2 x 2,500 L diesel tanks at the lower technical floor of each tower plus a 900 L tank at each roof technical floor, so 5,900 L per tower and 29,500 L across the development. The issue is that IBC Section 605.4.2.2 sets the aggregate fuel oil quantity on a per-building basis, with a maximum of 3,000 gallons (11,350 L) where protected above-ground tanks to UL 2085 are used in a sprinklered building. Per tower, we are within that limit, but across the development as a single building, we are not, by a wide margin. If the podium is 3-hour separated from all towers above, can I take a separate fuel limit for each tower, or do I have to add up the fuel across all five towers on the basis that the development is a single building? Sent in anonymously for discussion. Click Title to View | Submit Your Question | Subscribe
7 Comments
Donnie
8/20/2026 09:29:57 am
Quick answer: Yes, I would think so sine the MAQ is base on the aggregate and you have indicated a single building is involved.
Reply
Jack G
8/20/2026 01:12:50 pm
I agree with Donnie. With each tower being 3 hour and the IBC building separation distance chart is upheld then they are all separate structures.
Reply
Jeff Ayers
8/20/2026 01:46:08 pm
If the tanks are located in each tower, and NOT below the 3 hour transfer slab podium, then they can be counted individually.
Reply
anthony
8/20/2026 03:25:43 pm
Shouldn't the architect have a code compliance document outlining fire separations and have a code analysis on fire areas? I would start there and then do a code path analysis from there.
Reply
Chad
8/20/2026 03:29:35 pm
Have you defined if you have one or more control area?
Reply
chad
8/20/2026 03:30:52 pm
To be clear on what I mean- control areas are not always along the same line as fire areas. Plus you need to take into account what is allowed by floor
Reply
Ken Thackery
8/21/2026 10:39:36 am
Anthony is correct- this should be addressed in basis of design. That much fuel should not be in the building it should be in tanks outside with smaller day tanks in the generator rooms - I assume this is for diesel generators- Is this project outside the US? Just on its face having that much fuel in a building is a terrible idea.
Reply
Leave a Reply. |
ALL-ACCESSSUBSCRIBESubscribe and learn something new each day:
COMMUNITYTop July '26 Contributors
YOUR POSTPE EXAMGet 100 Days of Free Sample Questions right to you!
FILTERS
All
ARCHIVES
September 2026
PE PREP SERIES |
RSS Feed