Fire-Rated Separation for Data Center to Offices?

7/30/2026

8 Comments

 
A building will partially be a data center as part of a Group B Occupancy in the IBC.

Is a fire-resistance-rated separation required between the data halls and the offices?

The data center area has accessory rooms such as a sprinkler riser room and a fiber cable entry, which are rated, but I'm looking at the data hall versus office specifically. Table 509 of the IBC doesn't mention anything about data center areas specifically. 

Thanks in advance.

Sent in anonymously for discussion. Click Title to View | Submit Your Question | Subscribe
8 Comments
Glenn Berger
7/30/2026 08:14:33 am

A complete code analysis is required to be completed to determine the answer to your question.

Without knowing your locations or applicable codes or the complete layout including construction type, your question cannot be properly answered.

Reply
Todd Wyatt
7/30/2026 08:28:46 am

The (2) spaces/areas ... data halls and the offices ... would both be classified as Group B Business so Occupancy Classification (OC) separation would not be required.

As a potential Incidental Use, TABLE 509.1 INCIDENTAL USES may require 1-Hr or 2-Hr fire-resistance ratings (FRR) separation based on the "Electrical installations and transformers" per "See Sections 110.26 through 110.34 and Sections 450.8 through 450.48 of NFPA 70 for protection and separation requirements."

The AHJ may enforce NFPA 75 (Standard for the Fire Protection of Information Technology Equipment) which independently recommends FRR for IT equipment rooms based on risk analysis.

Reply
Jocelyn
7/30/2026 08:29:21 am

The required separation depends entirely on what occupancy the data center is classified as, which is dependent on the equipment inside and which code you are using.
Using IBC, for a very long time, data centers were considered Group B. If both the data center and offices are Group B, then no separation is required.
Due to changes and evolution in what's inside a typical data hall, there have been changes in the logic to what occupancy they are classified as. I have worked in some jurisdictions which require them to be Group S-2 or even S-1.
Beginning in 2024, the IBC also requires areas with ESS containing lithium-ion batteries to be considered F-1.
Once the occupancy is established, there are several separation strategies, assuming the offices end up being a different classification from the data halls, including separations per IBC Table 508.4, or nonseparated per IBC 508.3. There is no one answer, it will depend on the characteristics of the building (type of construction, number of stories, etc)

If the root of your question is, "If both the data hall and offices are Group B, do they have to be separated?", then the answer is no. BUT some owners elect to have a 1-hour rating around the data halls, although not explicitly required. And given the changes in how the data halls are considered, it might be a good idea to "future proof" the building and include a separation regardless.

Reply
Dan Wilder
7/30/2026 08:45:45 am

**Not a Code Consultant***

However, all the Data Centers I have done the last couple years, there was at least a one-hour rating provided around the major ITE areas with 2-Hour provided at Battery Rooms & Electric Rooms but the Data halls were not meeting the definition of "Incidental".

I would imagine that building construction, square footage, and several other factors will also play into this decision through the Building/Fire Code applicability plus any local amendments.

Looking at the Rating Chart - they do reference Table 509 for "Battery Rooms (VRLA)" so likely referencing "Electrical Installations" referencing back to NFPA 70.

Reply
Jack G
7/30/2026 09:24:03 am

So updating sprinkler design criteria does not permit omissions in fire walls ( just reduction in rating s increases allowable building area s for being sprinkered) as this is governed by the IBC chpt 7 and , section 508, govern structural compartmentalization, life safety, walls fire barriers life saftey egress separation and building area limitations..
So check your projects building code sheet ( plan made by the A&E) To find out what is specified and trade offs. And follow the IBC.

Reply
Ricardo Gonzales
7/30/2026 10:02:32 am

My recommendation is the Arch/FLS team have a sit down with the Building & Fire Departments. I've seen multiple different classifications from the B to F1(factory?) all based upon the Li-ion batteries used. No consistency and the IBC '27 doesn't help much since they mention Li-ion and assorted chemistries, but not how the racks are set up nor the HMMAs recommendations. So you still have B, S1 and F1. FDs are still in the fearful mode and work to tell the Building Department they're wrong.
The sit down and explaining how the client is planning the details and if a full-scale test has been performed and a corresponding HMMA has been written by a qualified entity.

Reply
Steve F
7/30/2026 11:36:02 am

Separation is likely not required under IBC, assuming that accessory/incidental areas (fire pump, electrical room, generator/ UPS/ESS rooms, etc.) are separated, and both areas are B/F/S occupancies or other allowed non-separated occupancies per IBC Table 509.1. However, many data centers built to FMDS 5-32 or owner specific specifications which can result in separations that are more restrictive than IBC.

Reply
Flocode55
8/3/2026 08:18:04 am

NOT A DESIGNER: It has been my experience that some sort of separation may be required based upon type of fire suppression system and areas served. It may not be fire rated but usually HVAC systems, closing doors, isolate these areas. The method of separation is the designer's, owner's, insurance companies', methodology for risk management. I have seen fire/smoke barriers, to smoke barriers, to minimal amount of protection.

Reply



Leave a Reply.

    SUBMIT A QUESTION
    Picture
    Why Sponsor?

    ALL-ACCESS

    Picture
    GET ALL OUR TOOLS

    SUBSCRIBE

    Subscribe and learn something new each day:
    I'm Interested In:

    COMMUNITY

    Top July '26 Contributors
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    SEE LEADERBOARD

    YOUR POST

    SUBMIT A QUESTION

    PE EXAM

    Get 100 Days of Free Sample Questions right to you!
    SIGN ME UP!

    FILTERS

    All
    A1171
    ABA
    ADA
    ASCE 7
    ASME A17.1
    ASTM E1354
    Blog Thread
    Daily Discussion
    Design-documents
    EN 12259-1
    EN 12845
    Explosion Protection
    Explosion-protection-prevention
    Fire Detection And Alarm Systems
    Fire Dynamics
    Flammable And Combustible Liquids
    Flammable-combustible-liquids
    FM Global
    Human-behavior
    IBC
    ICC 500
    IEBC
    IFC
    IMC
    IPC
    IRC
    ISO
    Means Of Egress
    NBC
    NFPA 1
    NFPA 10
    NFPA 101
    NFPA 11
    NFPA 110
    NFPA 1142
    NFPA 1221
    NFPA 13
    NFPA 13D
    NFPA 13R
    NFPA 14
    NFPA 15
    NFPA 16
    NFPA 17A
    NFPA 20
    NFPA 2001
    NFPA 214
    NFPA 22
    NFPA 220
    NFPA 24
    NFPA 241
    NFPA 25
    NFPA 291
    NFPA 30
    NFPA 307
    NFPA 30B
    NFPA 31
    NFPA 33
    NFPA 37
    NFPA 400
    NFPA 409
    Nfpa-415
    Nfpa-45
    Nfpa-495
    NFPA 497
    NFPA 5000
    NFPA 502
    NFPA 54
    NFPA 55
    NFPA 654
    NFPA 68
    NFPA 70
    NFPA 701
    NFPA 72
    NFPA 75
    NFPA 770
    NFPA 82
    NFPA 850
    NFPA 855
    NFPA 90A
    NFPA 92
    NFPA 96
    NICET
    OBC
    OSHA
    Passive Building Systems
    PE Prep Guide
    PE Prep Series
    PE Sample Problems
    Poll
    Smoke Management
    Special Hazard Systems
    UFC 3-600-01
    UFC 3-601-02
    UFC 4-021-01
    UFC 4-211-01
    UPC
    Updates
    Water Based Fire Suppression
    Weekly Exams


    ARCHIVES

    August 2026
    July 2026
    June 2026
    May 2026
    April 2026
    March 2026
    February 2026
    January 2026
    December 2025
    November 2025
    October 2025
    September 2025
    August 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    November 2016
    October 2016
    July 2016
    June 2016


    PE PREP SERIES

    SEE LEADERBOARD

    SEARCH THE FORUM

    RSS Feed

Picture
​Home
Our Cause
The Blog
The Forum
PE Exam Prep
The Toolkit

MeyerFire University
​Pricing
Login
​Support
Contact Us
Picture

MeyerFire.com is a startup community built to help fire protection professionals shine.
Our goal is to improve fire protection practices worldwide. We promote the industry by creating helpful tools and resources, and by bringing together industry professionals to share their expertise.

​MeyerFire, LLC is a NICET Recognized Training Provider and International Code Council Preferred Education Provider.

All text, images, and media ​Copyright © 2016-2025 MeyerFire, LLC

We respect your privacy and personal data. See our Privacy Policy and Terms of Service. 
The views, opinions, and information found on this site represent solely the author and do not represent the opinions of any other party, nor does the presented material assume responsibility for its use. Fire protection and life safety systems constitute a critical component for public health and safety and you should consult with a licensed professional for proper design and code adherence.

Discussions are solely for the purpose of peer review and the exchange of ideas. All comments are reviewed. Comments which do not contribute, are not relevant, are spam, or are disrespectful in nature may be removed. Information presented and opinions expressed should not be relied upon as a replacement for consulting services. Some (not all) outbound links on this website, such as Amazon links, are affiliate-based where we receive a small commission for orders placed elsewhere.

  • Blog
  • Forum
  • TOOLKIT
    • ALL TOOLS
    • BUY THE TOOLKIT
  • UNIVERSITY
    • ALL COURSES
    • JOIN THE UNIVERSITY
  • PE Exam
    • PE Forum & Errata
    • PE Store
    • PE Tools
    • PE PREP SERIES
    • PE Old Questions
  • STUDENTS
    • LAND JOB/INTERNSHIPS
    • STUDENT CONNECTOR
  • LOGIN
    • TOOLKIT-ONLY LOGIN
    • UNIVERSITY LOGIN
  • STORE
  • OUR CAUSE
    • ABOUT MEYERFIRE
    • JOB OPENINGS
    • BECOME AN INSTRUCTOR
    • HELP/SUPPORT