Picture

Does EC Spacing Affect the Response Type?

10/7/2026

4 Comments

 
Questions about extended coverage sprinklers and grey areas: Say you have a mix of Reliable G4 XLO extended coverage sprinklers and Tyco ELOC's in an existing property. They are protecting a variety of 16' x 16' applications as well as 20' x 20'.

The Tyco sprinkler, per the cutsheet, becomes standard response at 20' x 20', but the G4XLO EC only becomes standard response in Ordinary Hazard at 212 degrees.

The space is all either light hazard or all the heads applied are 155-165 degrees.

Do you have to look for and replace every Tyco head operating at 20' x 20' because it's a contradictory response type, and can you leave the ones that are 18' x 18' or less?

You have an extended-coverage sprinkler in a small room to protect the entire room. Due to the placement of the lights, you can only be 10'-0" off the wall in one direction, but are within 7'-0" of all other three walls. The room is 17 x 14 feet and light hazard. The room is 238 square feet.

​This is less than the 256' max of a 16' x 16' application, but since you're 10' off a wall, is this equivalent to a 20' x 20' application when you're figuring out the appropriate pressure for the head in your calculation?


Sent in anonymously for discussion. Click Title to View | Submit Your Question | Subscribe
4 Comments
Dan Wilder
10/7/2026 08:42:16 am

So, in 13-2019 edition and later, based on EOD questions:

9.4.3.5 applies for other than light hazard occupancies.

In light hazard occupancies, you need to maintain the same "Thermal Sensitivity" as noted in 9.4.3 for adjacent sprinklers within the same compartment.

Section 9.4.3.1 applies for installation meaning the sprinkler must be listed as quick response. As that listing is not available at the spacing it is installed, if there were modifications to that area, the sprinkler would need to be modified.

The caveat here is that there is no requirement to change the sprinkler based on the observation only (say a NFPA 25 inspection) or if it is outside your scope of work due to the already installed and approved condition. Recommended yes, but not required.

Now, conversations with AHJ's have been mixed.

The spacing, yes, if the sprinkler is 10' from a wall the spacing needs to be 20x20 because the sprinkler needs to discharge the water that full horizontal distance. It does not understand that it only needs to throw more one direction nor the total size of the room (there are exceptions, but not in this case).

Reply
Brett
10/7/2026 09:05:45 am

I answered the questions below based on NFPA 13 criteria and the assumption that you're already doing sprinkler system alterations in the area. If these questions are coming as a result of an NFPA 25 inspection in an existing building then I don't think NFPA 25 would require anything to be adjusted.

Question 1:

"Do you have to look for and replace every Tyco head operating at 20' x 20' because it's a contradictory response type, and can you leave the ones that are 18' x 18' or less?"

If it's not a light hazard space, then no. See NFPA 13 (2019) 9.4.3.5 below.

"In other than light hazard occupancies, where a sprinkler carries a listing for both standard-response protection and quick-response protection at different coverage areas, that sprinkler shall be permitted to be installed within a compartment at the spacing for both the quick-response and standard-response listings without any separation between the areas so covered."

If it's a light hazard space then it depends on the scope of the project. If an existing light hazard compartment has all standard response sprinklers, then you can replace them with all quick response sprinklers or all standard response sprinklers (see 9.4.3.1). If there is a mix of quick response and standard response then the standard doesn't allow that other than a few exceptions in section 9.4.3. If you're installing new quick response sprinklers then all the sprinklers in the compartment have to be quick response. See 9.4.3.6 below.

"When existing light hazard systems are converted to use quick-response or residential sprinklers, all sprinklers in a compartment shall be changed."

Question 2:

"​This is less than the 256' max of a 16' x 16' application, but since you're 10' off a wall, is this equivalent to a 20' x 20' application when you're figuring out the appropriate pressure for the head in your calculation?"

Yes, it is equivalent to a 20'x20' application because the sprinkler has to spray 10' in one direction which will require the listed pressure for 20'x20' spacing.

Reply
Jack G
10/7/2026 04:25:52 pm

I agree with Brett above. And reviewing the material data sheets the reliable qr sprinkler has an RTI of less than 50 ( the standard for qr) also the tyco head spaced at 20 x 20 has an RTI over 80 which makes it Standard response.
So as indicated above you cannot mix them ( QR&SR)
If a light hazard space then the tyco heads 20x20 - 10 ft off a wall, need replaced.
If they remain, then calculations for the space would lose the area reduction allowed for QR sprinklers. ( thermal skipping may occur is a reason you are not allowed to mix: (RTI significance,)
If an Ordinary hazard area the sprinklers would be all be considered standard response ( qr area reduction is out the window again ) but you must revisit the cut sheets as the density and water demand is significantly higher for ordinary hazard , and a regular MRA would apply.
( reliable head increases from 40 gpm to 80 gpm ).
Without the reduction ( for qr heads whether ordinary or light ) the new calculated demand may overflow the water supply. .
My opinion change the tyco sprinklers ( in 20 x 20, 10 ft off the wall conditions)

Reply
Jack G
10/7/2026 04:47:01 pm

Reviewing the tyco cut sheet, they are not listed for ordinary hazard an is another reason to replace with the Reliable sprinklers .,

Reply



Leave a Reply.

    SUBMIT A QUESTION
    Picture
    Why Sponsor?

    ALL-ACCESS

    Picture
    GET ALL OUR TOOLS

    SUBSCRIBE

    Subscribe and learn something new each day:
    I'm Interested In:

    COMMUNITY

    Top Oct '26 Contributors
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    SEE LEADERBOARD

    YOUR POST

    SUBMIT A QUESTION

    PE EXAM

    Get 100 Days of Free Sample Questions right to you!
    SIGN ME UP!

    FILTERS

    All
    A1171
    ABA
    ADA
    ASCE 7
    ASME A17.1
    ASTM E1354
    Blog Thread
    Daily Discussion
    Design-documents
    EN 12259-1
    EN 12845
    Explosion Protection
    Explosion-protection-prevention
    Fire Detection And Alarm Systems
    Fire Dynamics
    Flammable And Combustible Liquids
    Flammable-combustible-liquids
    FM Global
    Human-behavior
    IBC
    ICC 500
    IEBC
    IFC
    IMC
    IPC
    IRC
    ISO
    Means Of Egress
    NBC
    NFPA 1
    NFPA 10
    NFPA 101
    NFPA 11
    NFPA 110
    NFPA 1142
    NFPA 1221
    NFPA 13
    NFPA 13D
    NFPA 13R
    NFPA 14
    NFPA 15
    NFPA 16
    NFPA 17A
    NFPA 20
    NFPA 2001
    NFPA 214
    NFPA 22
    NFPA 220
    NFPA 221
    NFPA 24
    NFPA 241
    NFPA 25
    NFPA 291
    NFPA 30
    NFPA 307
    NFPA 30B
    NFPA 31
    NFPA 33
    NFPA 37
    NFPA 400
    NFPA 409
    Nfpa-415
    Nfpa-45
    Nfpa-495
    NFPA 497
    NFPA 5000
    NFPA 502
    NFPA 54
    NFPA 55
    NFPA 654
    NFPA 68
    NFPA 70
    NFPA 701
    NFPA 72
    NFPA 75
    NFPA 770
    NFPA 82
    NFPA 850
    NFPA 855
    NFPA 88A
    NFPA 90A
    NFPA 92
    NFPA 96
    NICET
    OBC
    OSHA
    Passive Building Systems
    PE Prep Guide
    PE Prep Series
    PE Sample Problems
    Poll
    Smoke Management
    Special Hazard Systems
    UFC 3-600-01
    UFC 3-601-02
    UFC 4-021-01
    UFC 4-211-01
    UPC
    Updates
    Water Based Fire Suppression
    Weekly Exams


    ARCHIVES

    November 2026
    October 2026
    September 2026
    August 2026
    July 2026
    June 2026
    May 2026
    April 2026
    March 2026
    February 2026
    January 2026
    December 2025
    November 2025
    October 2025
    September 2025
    August 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    November 2016
    October 2016
    July 2016
    June 2016


    PE PREP SERIES

    SEE LEADERBOARD

    SEARCH THE FORUM

    RSS Feed

Picture
​Home
Our Cause
The Blog
The Forum
PE Exam Prep
The Toolkit

MeyerFire University
​Pricing
Login
​Support
Contact Us
Picture

MeyerFire.com is a startup community built to help fire protection professionals shine.
Our goal is to improve fire protection practices worldwide. We promote the industry by creating helpful tools and resources, and by bringing together industry professionals to share their expertise.

​MeyerFire, LLC is a NICET Recognized Training Provider and International Code Council Preferred Education Provider.

All text, images, and media ​Copyright © 2016-2025 MeyerFire, LLC

We respect your privacy and personal data. See our Privacy Policy and Terms of Service. 
The views, opinions, and information found on this site represent solely the author and do not represent the opinions of any other party, nor does the presented material assume responsibility for its use. Fire protection and life safety systems constitute a critical component for public health and safety and you should consult with a licensed professional for proper design and code adherence.

Discussions are solely for the purpose of peer review and the exchange of ideas. All comments are reviewed. Comments which do not contribute, are not relevant, are spam, or are disrespectful in nature may be removed. Information presented and opinions expressed should not be relied upon as a replacement for consulting services. Some (not all) outbound links on this website, such as Amazon links, are affiliate-based where we receive a small commission for orders placed elsewhere.

  • Blog
  • Forum
  • TOOLKIT
    • ALL TOOLS
    • BUY THE TOOLKIT
  • UNIVERSITY
    • ALL COURSES
    • JOIN THE UNIVERSITY
  • PE Exam
    • PE Forum & Errata
    • PE Store
    • PE Tools
    • PE PREP SERIES
    • PE Old Questions
  • STUDENTS
    • LAND JOB/INTERNSHIPS
    • STUDENT CONNECTOR
  • LOGIN
    • TOOLKIT-ONLY LOGIN
    • UNIVERSITY LOGIN
  • STORE
  • OUR CAUSE
    • ABOUT MEYERFIRE
    • JOB OPENINGS
    • BECOME AN INSTRUCTOR
    • HELP/SUPPORT