MeyerFire
  • Blog
  • Forum
  • TOOLKIT
    • ALL TOOLS
    • BUY THE TOOLKIT
  • UNIVERSITY
    • ALL COURSES
    • JOIN THE UNIVERSITY
  • PE Exam
    • PE Forum & Errata
    • PE Store
    • PE Tools
    • PE PREP SERIES
    • PE Old Questions
  • STUDENTS
    • LAND JOB/INTERNSHIPS
    • STUDENT CONNECTOR
  • LOGIN
    • TOOLKIT-ONLY LOGIN
    • UNIVERSITY LOGIN
  • STORE
  • OUR CAUSE
    • ABOUT MEYERFIRE
    • JOB OPENINGS
    • BECOME AN INSTRUCTOR
    • HELP/SUPPORT
Picture

Calculate Space with Sprinklers Across 3 Stories?

10/21/2026

10 Comments

 
I have a 3-story building with a vertical opening that connects all floors. The vertical opening communicates (no rated separations) with portions of floors 1 and 2.

When determining the sprinkler design area (1500 sq for light hazard); should sprinklers be calculated on all 3 levels since they are likely to activate from a fire at the bottom level?

This would create some hydraulic challenges, right, since the heads at the bottom will see more pressure and flow much more water than the heads at the top?

It would seem to be simpler to enclose the vertical opening so that all the heads would be at the same elevation (top), but it's an existing building where we are adding a sprinkler system.

​Thanks in advance.

Sent in anonymously for discussion. Click Title to View | Submit Your Question | Subscribe
10 Comments
Dan Wilder
10/21/2026 07:58:47 am

Not including any protection scheme requirements for the vertical opening, the calculation would be for each floor/system not a combination of multiple systems/floors.

Reply
Glenn Berger
10/21/2026 08:31:15 am

I would provide individual floor level designs including calculations. If the lowest level and the intermediate levels are designed completely identical, then you can avoid one providing the lowest level design.

I know of no guidelines of combining various floor level sprinklers into one set of calculations.

Typical designs would include draft curtains around the openings in the floor.

Reply
Jesse
10/21/2026 08:34:50 am

Individual floor hydraulic remote areas should suffice

Reply
Pete D.
10/21/2026 09:15:53 am

Echoing others.
Each floor's hydraulically most demanding (often remote) area gets calculated. If you wish to perform a supplemental calc for the vertical opening, or if it is requested by the AHJ, it would only include sprinklers on the upper floor over the opening. I've found these atria can often be protected using extended coverage sidewalls around the perimeter or on opposite sides, which if you use, and the rest of the floor area use standard coverage sprinklers, requires an additional calc. If you're using SSPs in the upper floor over the opening, assuming there's not an overlap with the remote area, it should perform better hydraulically than the remote area. That's implicit in the "hydraulically most demanding" part of the remote area definition and the reason a supplemental calc is not required.

Reply
Brian
10/21/2026 11:36:25 am

It would seem to me that the purpose of draft curtains and draft stops is to prevent heat/smoke from traveling to floors above and fusing sprinkler heads. Not having this protection would allow heads to fuse on multiple floors, so it would seem that the heads around the opening on all levels should be included as a "remote area" and calculated.

Reply
Mark Harris
10/21/2026 04:03:20 pm

Not enough detail but may need water curtain sprinklers 6-0 on center around the opening. But to the original question agree with the comments that you only calc one level at a time. If there is a water curtain requirement may need to include those sprinklers in calc for the first and second floor calculations (but agree with Glenn that if they are similar, you would use the intermediate level calc for the lower level as well).

I don't remember the name but depending on size there are companies that make fire shutters for vertical openings. This could go beyond NFPA 13 if the building code requires rated construction between floors.

Reply
Streeter
10/21/2026 04:48:14 pm

This would only come up to me as a consideration if every floor area that communicated was less than 1500sf. And even then the sprinklers above the fire (whether on floor 1 or 2) or floor 3 if is is a 3 story atrium, would activate first to put out the fire.

Also your most hydraulically remote area would probably be 1500sf on the third floor, so if that calcs out i cannot think of a configuration that would be more demand if spread across 3 levels.

The real issue to consider as others have mentioned is whether you have all the necessary code requirements like draft stops/curtains and/or a water curtain.

Reply
Jack G
10/21/2026 08:46:00 pm

Under the Latest IBC (2024) and NFPA 13, a 3 story vertical opening connecting all floors without a fire separation is treated as an atrium ( section 404) or a communicating 2 story opening requiring an automatic sprinkler system thru out plus closely spaced sprinklers and draft curtains if relying on non rated open shaft alternatives.
Section 712- floor assemblies must maintain fire resistance continuity.
Openings connecting 3 stories require 1-2 hour rated shaft unless a specific exception applies.
Under Atrium Exception ( 404 and 712)
" if the vertical opening connects 3 stories, it generally triggers full atrium rules ( Including a Smoke Control System ) unless it qualifies under specific 2 story or communicating space provisions.
Draft curtains and closely spaced are required under NFPA 13 AND IBC 712. 13 requires a draft stop around the perimeter of the opening paired with close spaced sprinklers ( 3 gpm per linear foot )
For Hydraulic calculations across multiple levels ( when an open well connects multiple floors= levels ) with no fire barrier, a fire on a lower level can activate sprinklers on multiple vertically open tiers. HYDRAULIC CALCULATIONS must account for the most demanding design area ,which may require calculations heads operating simultaneously across the affected levels depending on whether smoke/ heat communications trip them .
The number of sprinklers to include in the MRA floor calc must be balanced to the water curtain and is usually not to exceed the length of the mra divided by the spacing of the water curtain sprinklers but not less than 3 gpm per linear foot of opening.( nfpa 13 19.3.3.2, 28.2.4.2.
The AHJ may want water curtain sprinkler flow added to the most MRA for the floor.
Please note that I don't believe NFPA promotes water curtains over fire barriers.

Reply
Jack G
10/21/2026 08:57:14 pm

I believe the AHJ would want water curtain sprinkler added for each of communicating draft stops to the most remote market floor calc. ( length of mra box divided by spacing of sprinklers times however many communicating floors without the 1-2 hour fire barriers. )
I ve checked meyetfire archives - went back to 2019, which did not answer the related question.

Reply



Leave a Reply.

    SUBMIT A QUESTION
    Picture
    Why Sponsor?

    ALL-ACCESS

    Picture
    GET ALL OUR TOOLS

    SUBSCRIBE

    Subscribe and learn something new each day:
    I'm Interested In:

    COMMUNITY

    Top Oct '26 Contributors
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    Picture
    SEE LEADERBOARD

    YOUR POST

    SUBMIT A QUESTION

    PE EXAM

    Get 100 Days of Free Sample Questions right to you!
    SIGN ME UP!

    FILTERS

    All
    A1171
    ABA
    ADA
    ASCE 7
    ASME A17.1
    ASTM E1354
    Blog Thread
    Daily Discussion
    Design-documents
    EN 12259-1
    EN 12845
    Explosion Protection
    Explosion-protection-prevention
    Fire Detection And Alarm Systems
    Fire Dynamics
    Flammable And Combustible Liquids
    Flammable-combustible-liquids
    FM Global
    Human-behavior
    IBC
    ICC 500
    IEBC
    IFC
    IMC
    IPC
    IRC
    ISO
    Means Of Egress
    NBC
    NFPA 1
    NFPA 10
    NFPA 101
    NFPA 11
    NFPA 110
    NFPA 1142
    NFPA 1221
    NFPA 13
    NFPA 13D
    NFPA 13R
    NFPA 14
    NFPA 15
    NFPA 16
    NFPA 17A
    NFPA 20
    NFPA 2001
    NFPA 214
    NFPA 22
    NFPA 220
    NFPA 221
    NFPA 24
    NFPA 241
    NFPA 25
    NFPA 291
    NFPA 30
    NFPA 307
    NFPA 30B
    NFPA 31
    NFPA 33
    NFPA 37
    NFPA 400
    NFPA 409
    Nfpa-415
    Nfpa-45
    Nfpa-495
    NFPA 497
    NFPA 5000
    NFPA 502
    NFPA 54
    NFPA 55
    NFPA 654
    NFPA 68
    NFPA 70
    NFPA 701
    NFPA 72
    NFPA 75
    NFPA 770
    NFPA 82
    NFPA 850
    NFPA 855
    NFPA 88A
    NFPA 90A
    NFPA 92
    NFPA 96
    NICET
    OBC
    OSHA
    Passive Building Systems
    PE Prep Guide
    PE Prep Series
    PE Sample Problems
    Poll
    Smoke Management
    Special Hazard Systems
    UFC 3-600-01
    UFC 3-601-02
    UFC 4-021-01
    UFC 4-211-01
    UPC
    Updates
    Water Based Fire Suppression
    Weekly Exams


    ARCHIVES

    November 2026
    October 2026
    September 2026
    August 2026
    July 2026
    June 2026
    May 2026
    April 2026
    March 2026
    February 2026
    January 2026
    December 2025
    November 2025
    October 2025
    September 2025
    August 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    July 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    January 2022
    December 2021
    November 2021
    October 2021
    September 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    November 2016
    October 2016
    July 2016
    June 2016


    PE PREP SERIES

    SEE LEADERBOARD

    SEARCH THE FORUM

    RSS Feed

Picture
​Home
Our Cause
The Blog
The Forum
PE Exam Prep
The Toolkit

MeyerFire University
​Pricing
Login
​Support
Contact Us
Picture

MeyerFire.com is a startup community built to help fire protection professionals shine.
Our goal is to improve fire protection practices worldwide. We promote the industry by creating helpful tools and resources, and by bringing together industry professionals to share their expertise.

​MeyerFire, LLC is a NICET Recognized Training Provider and International Code Council Preferred Education Provider.

All text, images, and media ​Copyright © 2016-2025 MeyerFire, LLC

We respect your privacy and personal data. See our Privacy Policy and Terms of Service. 
The views, opinions, and information found on this site represent solely the author and do not represent the opinions of any other party, nor does the presented material assume responsibility for its use. Fire protection and life safety systems constitute a critical component for public health and safety and you should consult with a licensed professional for proper design and code adherence.

Discussions are solely for the purpose of peer review and the exchange of ideas. All comments are reviewed. Comments which do not contribute, are not relevant, are spam, or are disrespectful in nature may be removed. Information presented and opinions expressed should not be relied upon as a replacement for consulting services. Some (not all) outbound links on this website, such as Amazon links, are affiliate-based where we receive a small commission for orders placed elsewhere.

  • Blog
  • Forum
  • TOOLKIT
    • ALL TOOLS
    • BUY THE TOOLKIT
  • UNIVERSITY
    • ALL COURSES
    • JOIN THE UNIVERSITY
  • PE Exam
    • PE Forum & Errata
    • PE Store
    • PE Tools
    • PE PREP SERIES
    • PE Old Questions
  • STUDENTS
    • LAND JOB/INTERNSHIPS
    • STUDENT CONNECTOR
  • LOGIN
    • TOOLKIT-ONLY LOGIN
    • UNIVERSITY LOGIN
  • STORE
  • OUR CAUSE
    • ABOUT MEYERFIRE
    • JOB OPENINGS
    • BECOME AN INSTRUCTOR
    • HELP/SUPPORT